Star Sports live footballWoodward Group designed and built a control system that allowed the company to store honey at the correct temperature and pump it Star Sports reviewfrom storage to production, where it would then either be heated or chilled.

We worked closely with the Hilltop Honey team to ensure the scope was fully understood, and we offered advice where needed. The system was a complete success, and the company is now looking to expand projection by another 150%.

CLIENT:

Hilltop Honey


SECTOR:

Food production


PROJECT:

Star Sports live footballHeating & Mixing control system.


BUDGET:

£60,000


WOODWARD DIVISION:

Company wide


REQUIREMENT:

Design, plan and install of a complete electrical control and power solution for a new heating and mixing process plant.


PROCESS:

Tender 


BACKGROUND:

Founded in 2011, Hilltop Honey was moving from protype to mass production of its packaged honey at its 14,000 sq. ft HQ, and needed a bespoke control system that enabled them to store honey at the correct temperature, and then pump the honey Star Sports reviewfrom storage to production, where the honey is then heated or chilled.


SOLUTION & OUTCOMES:

Conducting a 360-degree review of the production process and facility to ensure we fully understood the specific requirements, we developed a solution that exactly matched all operational requirements, created and installed with supporting advice to the Hilltop team along the way.

Working in close consultation with the client throughout, Star Sports live footballWoodward Group designed a bespoke solution that Star Sportsencompasses an electrical control solution that is voted a ‘complete success’ by Hilltop Honey, which is now planning to expand production by more than 150%.