SECTOR:<\/span><\/h6>\nRail, Commercial, Industrial<\/span><\/p>\n \nPROJECT:<\/span><\/h6>\nCrossrail Assembly Line<\/span><\/p>\n \nBUDGET:<\/span><\/h6>\n\u00a3230,000<\/span><\/p>\n \nWOODWARD DIVISION:<\/span><\/h6>\nElectrical & Energy Efficient Solutions<\/span><\/p>\n \nREQUIREMENT:<\/span><\/h6>\nThe design, specification and installation of a complete electrical LED and emergency lighting system. <\/span><\/p>\n \nPROCESS:<\/span><\/h6>\nCompetitive tender<\/span><\/p>\n \nBACKGROUND:<\/span><\/h6>\nWoodward Group has provided ongoing maintenance work and compliance testing activity at Bombardier\u2019s Derby site for several years. The Crossrail Assembly Line project centred around the transformation of two assembly bays, refurbished to suit the bespoke requirements of the Crossrail carriages.<\/span><\/p>\nCareful and scoping planning was critical for the project to run smoothly.<\/span> \nThis project is the largest installation project undertaken by Woodward Group for Bombardier.<\/span><\/p>\n \nSOLUTION & OUTCOMES:<\/span><\/h6>\nOur team worked with Bombardier\u2019s multi-disciplinary team of engineers and contractors on the highly prestigious Crossrail project.<\/span><\/p>\nThe majority of the installation work was carried out using Mobile Elevating Work Platforms (MEWPs) and carried out by our highly qualified and IPAF accredited employees.<\/span><\/p>\nThe project began with the strip-out of the existing installation, whilst maintaining the power supply to the equipment to minimise disruption to production, followed by:<\/span><\/p>\n\nInstallation of Star Sports live football400A Zucchini bus-bar trunking and high level containment<\/span><\/li>\nHigh level work including a new Eaton LED lighting scheme delivering an average of 500LUX<\/span><\/li>\nEmergency lighting scheme compliant to BS5266:2016<\/span><\/li>\nData cabling<\/span><\/li>\nInstallation of heating supplies<\/span><\/li>\nLow-level work consisted of low and extra voltage distribution boards, and feeding equipment for the assembly lines.<\/span><\/li>\n<\/ul>\nAll aspects of the project were completed within budget and on time, with final testing and commissioning revealing no issues or alterations. The National Inspection Council for Electrical Installation Contracting (NECEIC) selected the project for audit as part of its annual inspection of Woodward Group, and confirmed no non-conformities.<\/span>[\/vc_column_text][\/vc_column][\/vc_row]\n<\/div>","protected":false},"excerpt":{"rendered":"[vc_row css=”.vc_custom_1517307733764{padding-top: 10vh !important;}”][vc_column thb_color=”thb-light-column” el_class=”portfolio-mast-head”][vc_text_separator title=”Electrical & Energy Efficient Solutions”][vc_column_text animation=”animation bottom-to-top” el_class=”text-center”] Complete production line installation for Crossrail assembly lines [\/vc_column_text][\/vc_column][\/vc_row][vc_row css=”.vc_custom_1592562215688{padding-top: 6vh !important;}”][vc_column thb_color=”thb-light-column” width=”2\/3″][vc_column_text animation=”animation bottom-to-top”] Woodward Group worked alongside Bombardier\u2019s multi-disciplinary team of engineers and contractors on the highly prestigious Crossrail project. We successfully completed the project on time, within…<\/p>\n","protected":false},"featured_media":738,"comment_status":"closed","ping_status":"closed","template":"","tags":[16],"class_list":["post-325","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","tag-energy-solutions","portfolio-category-energy-solutions"],"yoast_head":"\n
Complete production line installation for Crossrail assembly lines - Woodward Group<\/title>\n \n \n \n \n \n \n \n \n \n \n\t \n\t \n\t \n \n \n\t \n